The Renova Foundation installs coffers on the canal that connects the Pequeno River to the Doce River in Linhares (ES). The temporary structures serve to facilitate the execution of dry works inside the canal. The intervention is the first step foreseen in the feasibility studies for lowering of the canal.
WORKS AT THE PEQUENO RIVER BARRIER
Published in: 08/02/2019
×